Successfully positioned 150-ton industrial equipment with precision alignment in confined space.
Equipment: 200-ton Liebherr LTM 1200
Location: Manufacturing Facility, Ohio
Date: Q3 2024
High-rise building construction with coordinated multi-crane operations for 40-story structure.
Equipment: 2x 350-ton Liebherr LTM
Location: Downtown District, PA
Date: Q2 2024
Installation of multiple 80-meter hub height wind turbines with specialized equipment.
Quantity: 12 Turbines (3.5 MW)
Location: Wind Farm, WY
Date: Q4 2023
Installation of pre-stressed concrete beams for new 4-lane highway bridge expansion.
Beams Installed: 24 Girders (up to 90 tons)
Location: Freeway Project, CA
Date: Q3 2023
Installation of critical power generation equipment weighing up to 300 tons.
Equipment: 500-ton Liebherr LTM 1500
Location: Power Plant, FL
Date: Q2 2023
Client: Premier Development Corp
Project Scope: 40-story mixed-use building featuring office, residential, and retail spaces
The project required coordinated lifting of structural steel beams averaging 40 tons, with strict timeline requirements and urban location constraints. Wind restrictions and proximity to existing buildings necessitated precise equipment coordination.
Qureshi Tec deployed two 350-ton Liebherr LTM cranes with synchronized operations and detailed planning. Our team developed a custom lifting sequence that optimized safety and schedule while accommodating weather and site conditions.