Projects

Our Recent Work

Showcasing Our Expertise & Capabilities

Explore our case studies and project achievements across heavy lifting, construction, recovery, and industrial operations.

✉️

Email

info@qureshi-tec.com

📞

Phone

+91-9867155700

🌐

Website

www.qureshi-tec.com

📍

Address

101, Rishikesh Aura

Taloja, Navi Mumbai

Industrial Equipment Installation
Heavy Lift

Industrial Equipment Installation

Successfully positioned 150-ton industrial equipment with precision alignment in confined space.

Equipment: 200-ton Liebherr LTM 1200

Location: Manufacturing Facility, Ohio

Date: Q3 2024

Building Construction
Construction

Skyscraper Structural Steel Erection

High-rise building construction with coordinated multi-crane operations for 40-story structure.

Equipment: 2x 350-ton Liebherr LTM

Location: Downtown District, PA

Date: Q2 2024

Turbine Installation
Industrial

Wind Turbine Installation

Installation of multiple 80-meter hub height wind turbines with specialized equipment.

Quantity: 12 Turbines (3.5 MW)

Location: Wind Farm, WY

Date: Q4 2023

Bridge Construction
Construction

Highway Bridge Beam Installation

Installation of pre-stressed concrete beams for new 4-lane highway bridge expansion.

Beams Installed: 24 Girders (up to 90 tons)

Location: Freeway Project, CA

Date: Q3 2023

Power Equipment Installation
Heavy Lift

Power Plant Equipment Installation

Installation of critical power generation equipment weighing up to 300 tons.

Equipment: 500-ton Liebherr LTM 1500

Location: Power Plant, FL

Date: Q2 2023

Featured Case Study

Case Study

Skyscraper Structural Steel Erection

Client: Premier Development Corp

Project Scope: 40-story mixed-use building featuring office, residential, and retail spaces

Challenge

The project required coordinated lifting of structural steel beams averaging 40 tons, with strict timeline requirements and urban location constraints. Wind restrictions and proximity to existing buildings necessitated precise equipment coordination.

Solution

Qureshi Tec deployed two 350-ton Liebherr LTM cranes with synchronized operations and detailed planning. Our team developed a custom lifting sequence that optimized safety and schedule while accommodating weather and site conditions.

Results

  • 2,400+ steel beams lifted without incident
  • Zero safety violations or near-misses
  • Project completed 5 days ahead of schedule
  • Client requested Apex for future phases
Discuss Your Project

Project Statistics

500+

Total Projects

2.5M+

Tons Lifted

$500M+

Project Value

100%

Safety Record

Start Your Project With Us

Let's discuss how we can deliver exceptional results for your crane service needs

Get in Touch
💬